Proper installation and alignment of your TC500 CNC lathe are critical for achieving precision machining and extending machine life. This guide walks you through the step-by-step process of setting up the lathe on an inline bed, including foundation preparation, leveling, and final alignment checks. Follow these instructions carefully to ensure optimal performance.
1. Pre-Installation Preparation
1.1 Site Requirements
Floor Strength: The foundation must support at least 1.5x the machine weight (TC500 weighs ~3000 kg). Concrete thickness should be ≥200mm.
Space Allowance: Ensure at least 1m clearance around the machine for maintenance and operation.
Power & Air Supply: Verify voltage (typically 380V/50Hz) and compressed air (6-8 bar) availability.
1.2 Tools & Equipment Needed
Precision level (0.02mm/m accuracy)
Dial indicator & magnetic base
Shim set (0.1mm to 1mm thickness)
Anchor bolts (M16 or as specified)
Torque wrench
Hoist or forklift (3-ton capacity)
2. Machine Placement
2.1 Moving the Lathe
Use a forklift with spreader bar or overhead crane to lift the machine.
Place wooden blocks under the bed to prevent damage during positioning.
2.2 Rough Leveling
Position the lathe on the foundation, aligning it with layout marks.
Place temporary shims under the bed feet to approximate level.
3. Foundation Bolting & Final Leveling
3.1 Anchor Bolt Installation
Drill holes in the foundation according to the machine’s base template.
Insert anchor bolts and tighten hand-tight only (final torque later).
3.2 Precision Leveling
Place the precision level on the machine’s guideways (X and Z axes).